CECEP Solar Energy Dalad Banner 500 MW Sand Control and PV Integration Project is located in Ordos City, Inner Mongolia Autonomous Region. As part of Inner Mongolia’s sand control and wind-PV integration project, it is equipped with a 75MW/150MWh electrochemical energy storage system. After completion, the project is expected to deliver approximately 850 million kWh of green electricity annually, saving about 260,000 tons of standard coal.
The project adopts the "PV + Sand Control" model.Through the integrated application of reducing evaporation with PV panels, fixing sand with module foundations, carrying out planting and breeding under the panels, and using crops to surround and fix sand, it not only provides clean and renewable energy for the local area, but also effectively improves the regional ecological environment. It plays an important role in building an ecological barrier on the southern bank of the Yellow River, contributing to the win-win of ecological, economic and social benefits.
Sand control work is carried out simultaneously during the project construction. By sowing grass seeds, laying sand barriers, planting trees and other measures, the vegetation coverage rate is expected to increase to more than 65%.